We’re building in Olds, Alberta. Have questions? Explore our videos and local updates →

Synapse Data Center And Natural Gas Plant Development

A proposed 1.0 GW data centre with 1.4 GW of on-site power in Olds, delivering long-term economic value through jobs and infrastructure investment.

Our Approach to Noise, Emissions & Water

Watch the update to learn how we’re managing impacts to
meet environmental standards.

We are committed to minimizing the Project's footprint on the community and environment.

NOISE

A professional Noise Impact Assessment (NIA) is being conducted. The Project will be designed to meet or exceed AUC Rule 012 noise limits at the nearest residences. Mitigation measures may include acoustic lagging, silencers, and strategic building orientation.

AIR QUALITY

The facility will utilize advanced emission-control technology. An Air Quality Assessment is underway to ensure compliance with the Alberta Ambient Air Quality Objectives (AAAQO).

TRAFFIC

During construction, there will be an increase in local traffic. We are working with Mountain View County/Town of Olds to develop a Traffic Management Plan to ensure safety and minimize disruption on local roads.

WATER USAGE

The data center and natural gas plant will each utilize a closed-loop cooling system to minimize water consumption saving 100s of millions of liters per year in water consumption compared to comparable designs.

VISUALS

The facility will be designed with neutral colors. The project adheres to all municipal bylaw setback requirements. 

POWERING THE NEXT PHASE OF CENTRAL ALBERTA’S ECONOMY

 

Benefits for the Olds, Alberta Community

7,000 JOBS CREATED

Each direct job creates six jobs

*Based on 6:1 employment multiplier industry model, PWC Report

LOCAL
ENERGY

Buying energy from local natural gas plants stabilizes plants longterm

WORKFORCE DEVELOPMENT

Exploring partnerships with local colleges to provide youth with training

2,000

CONSTRUCTION JOBS

A multi-year construction pipeline provides long-term stability for regional tradespeople

1,000

PERMANENT JOBS

 

Roles in engineering, IT, and site operations

+100M LITERS

OF WATER SAVED

Our closed-loop energy plant saves water annually and cuts our carbon footprint

Site Layout

The Project is proposed to be located in the industrial area at the North East corner of highway 2A and 27 in the Town of Olds, Alberta.

COORDINATES:  5;1;33;4;SW and 5;1;33;4;NW.

 

Elevation Drawings

Plant Layout

The plant’s layout features a gas turbine system designed for maximum efficiency. By capturing and reusing waste heat, the system generates additional power without extra fuel, reducing overall energy consumption. This self-sustaining design ensures the plant can operate continuously while minimizing its environmental footprint and conserving resources.

Frequently Asked Questions

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

What is a data centre?

A data centre is a secure, purpose-built facility that houses computer servers and networking equipment used to store, process, and transmit digital information. Data centres support services such as cloud computing, artificial intelligence tools, online platforms, telecommunications, and digital records.

What is a CCGT plant?
Why are data centres being developed in Alberta?

The Government of Alberta is actively supporting digital infrastructure as part of a broader economic diversification and technology strategy. This includes attracting data centres to Alberta due to factors such as power availability, climate, and a business-friendly regulatory environment. Globally, AI Data Centre growth is expected to be approximately 33% over each of the next 5 years, equating to hundreds of billions of dollars in annual investment. Driving this demand is the growing integration of artificial intelligence into our economies in addition to ‘data sovereignty’ pushes by national governments, including Canada, to house critical data within their borders.

Who approves data centres?

Approvals for Data Centres are shared across jurisdictions:

  • Alberta Utilities Commission – power generation, transmission, and grid connections.

  • Government of Alberta – electricity policy, water licensing, and environmental regulation.

  • Town of Olds – considers zoning, development permits, building permits, and local servicing.

Will a data centre affect local power reliability or electricity bills?

The data center and natural gas plant will operate independently and are not planned to connect to the public electricity grid at this time.

Electricity generation and grid reliability are regulated at the provincial level, not by the Town. Large power users are reviewed through provincial processes to ensure grid stability and reliability.

The Government of Alberta has stated that protecting electricity reliability and affordability for Albertans is a priority, and that data centres that do not connect to the grid will be given higher priority. All Data Centre developers the Town has communicated with propose significant natural gas power generation to offset or eliminate the need to connect to the electrical grid for computing processes.

Do data centres use large amounts of water?

Water use varies significantly depending on the cooling technology used. Many new data centres rely on air-based or low-water cooling systems, such as closed systems, as water conservation is a real concern that must be addressed. Synapse Data Center and Natural Gas plant will both use closed loops systems reducing water consumption by 99%+ compared to traditional data centers and natural gas plants. In fact the data center and natural gas plant should use less water each day then the people operating the facilities.

How much water will this project use?

The project is expected to use about 20 m³ of water per day for on-site staff, with a similar amount associated with the natural gas plant. The data center itself is not expected to use water on a daily basis.

Is there sufficient water in Olds for data centres?

Yes, the Town of Olds is a member of the Mountain View Regional Water Services Commission, which draws water from the Red Deer River. The commission currently holds an annual water license for over 9 million cubic meters of water and only uses about half of that allocation. It is anticipated Synapse data centre will use <1% to the Town’s current monthly water usage.

Will the cooling system use chemicals?

The cooling system uses a closed loop that uses Glycol to prevent freezing of the water. Glycol will be handled and disposed of according to manufacturer and provincial environmental rules, and is reviewed as part of the permitting process.

How will the project impact nearby residents and the environment?

The project will fully comply with offset distances from property lines as set by the municipality and the provincial noise and emission limits. To date, the Alberta government has not identified any health risks for residents when these regulations are followed.

What about noise, lights, and other neighbourhood impacts?

While all industrial areas are located on the periphery of Town, reducing impact, data centres are still required, as part of the AUC approval process, to complete a Noise Impact Assessment and Air Quality Assessment. Municipal development approvals will also require an exterior lighting plan that mitigates visual impacts on adjacent neighbours.

A Traffic Impact Assessment (TIA) will be conducted during the development and permitting process to address construction traffic.

Can the Town adequately respond to fires at these facilities?

Yes. Data centres are designed with multiple layers of fire prevention and suppression built into the facility. The Olds Fire Department is trained and equipped to respond to industrial and commercial fires and already plans for facilities with specialized risks. Water availability, access, and emergency response requirements are reviewed as part of the development and permitting process, and any additional site-specific fire protection measures are the developer’s responsibility.

What are the benefits to the community?

Benefits to the Town include:

  • Construction-phase economic activity

  • Permanent job creation

  • Increased revenue to fund public services

  • Alignment with broader provincial and national economic development goals

  • Multiplier effect (attracting supporting industries)

Are there risks associated with data centres?

Like other large industrial developments, potential concerns can include: power demand (regulated provincially), water use (licensed provincially), noise and visual impacts (managed municipally), and infrastructure impacts such as roads and servicing (reviewed through development approvals with costs borne by developers). Each risk is managed by the level of government with the corresponding regulatory authority.

When will the application be filed and until when can we raise concerns?

You have until February 12th, 2026 to raise any concerns or provide feedback about the project as shared in the AUC kit.

What is the timeline to completion?

The expected timeline for completion is 12–18 months to receive all required permits. Provincial permits can take approximately 4–9 months to obtain.

Where can I find the Project Information Package?

You can access the full Project Information Package here.

What type of jobs will be created?

The positions will span a wide range of functions, from entry-level to experience professionals, including:

  • IT and network engineers
  • Security technicians
  • Data center technicians
  • Facilities technicians
  • Electricians
  • Refrigeration Mechanics
  • Project management
  • Administrative and support roles

Most of these jobs will be on-site and not remote.

When will hiring begin?

Hiring will take place in phases. Some roles will open during the construction and setup period, while others will be added as operations ramp up. More detailed timelines will be shared as the project progresses.

Who can apply?

We welcome applications from a wide range of candidates. Each position has its own qualifications and requirements, so interested applicants should review the details of individual roles as they are posted. Working in a data center environment requires strong attention to detail, the ability to follow defined procedures, and a security-first mindset in every role. We will be seeking individuals who demonstrate professionalism, accountability, and a commitment to operating safely and reliably while contributing to a high-performance, team-oriented environment.

Do I need data center experience to apply?

We believe strongly in hiring motivated talent at all stages of their careers, including candidates who may be new to the industry. With our rigorous training and development programs, we focus on hiring potential and providing the skills, certifications, and mentorship needed to succeed and grow within our organization.

How can interested candidates apply?

Application details will be posted on our careers page and shared through local employment centers, colleges and partners. We encourage candidates to monitor official announcements for updates.

Your Title Goes Here

Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.

Community Engagement

Still have questions or want to learn more? Reach out using the form below, and we’ll be happy to connect.

Listen here to our founder, Jason van Gaal as he speaks with your local radio station, 96.5 The Ranch!

INFO@SYNAPSEDATACENTER.COM

© All Rights Reserved | 2026